Bag & Mix Sizing Accurate premix bag yields & ready-mix cost comparisons for NYC
Call (646) 922-9144
Premixed Bags & Hand Pouring

Concrete Mix & Bag Calculator

Calculate the exact number of 40 lb, 50 lb, 60 lb, or 80 lb premixed concrete bags needed for your pour, along with estimated water volume and cost comparisons against ready-mix delivery.

Bag Selection & Dimensions

%
Bag Requirements
Bags to Purchase (with waste)
62 bags (80 lb)
Estimated Material Cost: $542.50
Total Volume in Cubic Yards: 1.36 yd³
Total Volume in Cubic Feet: 36.7 ft³
Clean Mixing Water Needed: 47 gallons (178 L)
Too Many Bags to Hand Mix?
Save hours of backbreaking labor. Connect with an NYC concrete contractor for truck delivery and clean finishing.
Call (646) 922-9144

Premixed Concrete Bags vs. Cement Bags: Crucial Differences

A common mistake among DIYers and homeowners is confusing premixed concrete bags with pure Portland cement bags:

Documented Bag Yield Benchmarks

Bag Weight Yield in Cubic Feet Bags Needed per 1 yd³ Typical Water per Bag
80 lb (36.3 kg) 0.60 ft³ 45 bags 3.0 quarts (0.75 gal)
60 lb (27.2 kg) 0.45 ft³ 60 bags 2.25 quarts (0.56 gal)
50 lb (22.7 kg) 0.375 ft³ 72 bags 1.9 quarts (0.47 gal)
40 lb (18.1 kg) 0.30 ft³ 90 bags 1.5 quarts (0.38 gal)

When to Switch to Ready-Mix Delivery

If your calculation calls for more than 60 to 75 bags (around 1.5 cubic yards), hand-mixing becomes intensely labor-intensive. Mixing 60 bags of 80 lb concrete means handling 4,800 pounds (2.4 tons) of raw material. Premature setting while you mix subsequent batches can cause weak cold joints. In New York City, ordering ready-mix truck delivery for pours over 1.5 yd³ saves hours and ensures certified 4,000 PSI strength.

Ready-Mix Delivery? (646) 922-9144
Call (646) 922-9144